Send Message
Contact Us

Contact Person : Julia

Phone Number : 86-18037871307

WhatsApp : +8618037871307

Free call

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface

Minimum Order Quantity : Negotiation Price : Negotiation
Packaging Details : Standard National Packing Method Delivery Time : Depends on the quality of client
Payment Terms : 30% advanced payment , 70% balance payment before shipment or negociatable, T/T Supply Ability : 30000 Ton/Tons per Year
Brand Name: DINGLI Certification: ISO9001

Detail Information

Place Of Origin: China Model Number: 10-750kV
Height: From 10M-100M Or According To The Drawing Requirements Suit For: Electric Power Transmission And Distribution
Surface Treatment: Hot Dip Galvanizing Antirust Welding Standard: AWS(American Welding Society)D 1.1
Standard: GB / ANSI / TIA-222-G The Connection Method: Flanged Connected, Splice Way
Type: Transmission Line Tower
High Light:

Hot Dip Galvanization Pole Tower

,

ISO14001 Transmission Line Tower

,

Painting Surface Transmission Line Tower

Product Description

Hot Dip Galvanization And Painting Power Transmission Line Steel Pole Tower For Power Transmission

 

Product Description

Item
value
Model Number
10-750kV
Type
Transmission line tower
Place of Origin
China
Brand Name
   DINGLI
Certification
ISO9001, ISO45001, ISO14001
Height
From 10M-100M or according to the drawing requirements
Suit for
Electric Power Transmission and Distribution
Welding Standard
AWS(American Welding Society)D 1.1
Standard
GB / ANSI / TIA-222-G
The connection method
Flanged connected, Splice way
Certification
ISO9001
Packages
Bind with wire or according to customer demand
Surface treatment
Hot dip galvanization / Painting
Service life
50 years

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 0

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 1

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 2

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 3

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 4

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 5

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 6

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 7

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 8
Competitive Advantage:

Why Us

1. Experienced staffs replying your inquiry in 24 working hours in fluent English.

2. Customized design is available. OEM&UBM are welcomed.

3. Perfect after sales service. Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staff.

4. Professional factory direct :Best price and timely delivery can be assured.

5. Very convenient transportation.

6. As an honest seller, we always use superior raw material, advanced machines, skilled technicians to ensure our products to be finished in high quality and stable feature. Welcome to contact us or visit our company anytime.

Experienced senior engineers and technical staff keeping on learning can help perform design accurately and timely and ensure quality, reliability and innovation of products. With the help of the latest advanced design software of PLS-Pole and AutoCAD, experienced engineers of the Company can design schemes meeting complex landform and environment, so as to meet various needs of customers.

In the whole pole and tower manufacturing industry, experienced engineers and designers make the Company be available of designing accurately and timely and ensuring quality, safety and easy construction. On the basis of an excellent design team, the Company further configures software of PLS-Tower, AutoCAD, BOCAD and other CAD and updates the software in real time to ensure the software is the latest.

Supported by both domestic engineering company and Quito tower design center, could provide technical consultant and design service within our scope of work. For Quito tower design center, most of the engineers are local staffs. The Design is based on ASTM protocols meantime with GB material standard, which will reduce the weight, and avoid the replacement on the profiles to save the working time.

Project management—Your Dingli Utility project manager oversees all the details necessary to ensure your project delivers as specified. What’s more, he/she communicates with you every step of the way.

1. About us

HENAN DINGLI was founded in 1963 as a small electric power equipment manufacturer, after more than 50 years’development, DINGLI now is group company dedicated on total solutions for electricity projects covering survey, design, manufacture, complete equipment supply, construction, operations, maintenance, investment and so on. HENAN DINGLI actively devote to power grid construction, participated in all UHV construction projects and made an outstanding contribution to UHV transmission lines of China.

Since 2000, HENAN DINGLI has been actively developing international business, successively built Ecuador, Cambodia manufacturing Base, Quito tower design center, Spain, Peru, Chile and other overseas service centers. We have got a number of international certificates, such as ISO certificate covering design, equipment and construction, AWS welding certificate, ASTM system certificate, Chile NCH 203 certificate, Colombia RETIE certificate, Costa Rica material quality Certificate, etc. By the end of 2018, the overall proportion of international business is more than 30% of the company's main revenue. We have provided high-quality products and services to more than 100 customers in 33 countries, including the markets of Europe, America, Africa and Southeast Asia. With strong technical support and on-site service capability, HENAN DINGLI has saved a lot of project costs for customers and won their recognition.

To improve the products’ quality and provide superior service for our customers, DINGLI has started using new Production Line for towers at the beginning of 2018. The production line is the most advanced one in the ASIA, which with all the equipment from Italy (Brand: FICEP) and satisfying the most strict laws and regulations of environmental protection in China. The production line equipped with high level of automatic operation, especially the hot dip galvanization, which can meet ASTM standard, EN standard, GB standard under the computer control system.

2. International Certificate

ASTM,RETIE,Nch203,Costa Rica ASTM,EPC,TCL,ect.

3. After-Sale Service

Technical Support

Technical support on pre-sales stage. DINGLI has own survey and engineering company with more than 100 engineers. We have special pre-sales engineer to work with customer at early stage of the project.

Site assistance

Site assistance in Latin American market, so far we have sales and service center in Spain, Chile, Bolivia, Peru, Ecuador, Senegal, which will make a fast response for customer.

Warehouse and Emergency Supply

Warehouse and emergency supply for spare parts, damage parts and missing parts: DINGLI has built production line in Quito and warehouse for transmission line and distribution network in Ecuador, Bolivia and Senegal with common use spare parts.

Design and Consultant

Supported by both domestic engineering company and Quito tower design center, could provide technical consultant and design service within our scope of work. For Quito tower design center, most of the engineers are local staffs. The Design is based on ASTM protocols meantime with GB material standard, which will reduce the weight, and avoid the replacement on the profiles to save the working time.

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 9

 

 

4. Package

A. Profiles packing methods:

Profiles will be packed by drums. Each drum shall not exceed 2 tons. The profiles below length of 5.8 meters at least tied 4 times, above length of 5.8 meters at least tied 6 times, to ensure them are not scattered bundle.

Each drum could be adjusted by customers when packing. And there is a plastic filler piece between every two profiles to avoid being worn.

B. Steel Plate packing methods:

The steel plate ( including warning signs and number plate) will be packed by iron boxes, each box shouldn’t exceed 2 tons.

There are beams under the box for forklift loading. And each box has lifting holes around the foursquare easy for lift loading.

C. Bolts packing methods:

Each type of bolts ( including nuts, washers, etc.) will be individually wrapped in woven bags . Each woven bag should not exceed 30KG, then packed in metal bucket. Each bucket should not exceed 1.5 tons.

D. Identification

Correspondingly, each product has detailed identification from piece to packing box.

E. New packing solution

We also offer a better protect packing solution, named railway frame loading solution.

Techniques:

The products will be fixed as one unit in the container then mounted on the frame, and there are wheels under the frames. Installing rails in the container, put the frame with products into the container, then fix it.

In this case, we would additionally charge 1500USD/40GP for the cost price of welding frame and rails in the factory.

Remarks: Dingli has applied patent for this packing method in 20th OCT, 2016.

 

 

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 10

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 11

 

5. Global-network map

China

Henan DINGLI Pole and Tower Co., ltd.

Henan Zhongdingxin Detection Technology Co.,ltd.

Henan Dadi Electricity Engineering Co.,ltd.

Henan DINGLI Power Equipment Co.,ltd

Henan DINGLI Power Construction Co., ltd

Huading Concrete Pole Co., Ltd

Xingjiang Huili Steel Tower Co., Ltd.

Bazhou Dingli Tower Co., Ltd.

Shanghai Sales and Service Center

Beijing Sales and Service Center

 

Cambodia

Cambodia Phnom Penh Factory

 

Spain

Madrid (Spain) Sales and Service Center

 

Dakar, Senegal

 

Senegal (Dakar) Sales and Service Center

Senegal (Dakar) Spare Part Warehouse

 

Quito, Ecuador

 

Quito (Ecuador) Steel Tower Design Center (ASTM Standard)

Quito (Ecuador) Steel Tower Emergency Production Line

Quito (Ecuador) Raw Material and Spare Part Warehouse

 

Lima, Peru

Lima (Peru) Sales and Service Center

 

Cochabamba, Bolivia

Cochabamba (Bolivia) Raw Material and Spare Part Warehouse

 

Santiago, Chile

Santiago (Chile) Sales and Service Center

 

Jakarta, Indonesia

Jakarta (Indonesia) Sales and Service Center

 

 

 

 

 

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 12

6. International Fully Automatic Pollution-free Galvanizing Line

All the production line of galvanization is sealed off, it is operated by 7 workers with a yearly capacity of 160,000 tons.

In the new production line, we invest whole package of lifting equipment, all the loading works will be completed in our factory, in this case, it will be avoided two times loading during transportation, we are doing our best to protecting our products as always.

The new production line has improved on the part number tracking system, with this system we are doing better to avoid the missing parts problem

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 13

 

7. Customer Visit

Clients of Bolivia visited Dingli for factory inspection, we talked about the key issues faced right now, and found ways to solve it together. They set a high value on this cooperation.

 

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 14

 

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 15

 

Product Testing:

On December 16, 2018, the steel poles FAT test for project 20kv transmission line in DR-Congo were carried out in our company's

steel pole test workshop. Participating in the test were representatives of the Spanish EPC and representatives team from the

Democratic State Grid of DR- Congo. A total of six representatives came to witness the results of the FAT test. There had 6

types of steel pole were carried out the FAT test. Items of FAT test includes: Material Test, Proofing Test and Loading Test.

Customers are very satisfied with the test results of our products. The higher test results show that the product quality of

our steel poles is very reliable.

8. Customers and Partners of Dingli

Transmission Line Power Steel Pole Tower Hot Dip Galvanization And Painting Surface 16

 

 

You Might Be Into These
Get in touch with us

Enter Your Message

julia@hndlpe.com
+8618037871307
86-18037871307
86-18037871307
86-18037871307