15m-120m Angle Steel Telecom Tower Communication Network Construction
Contact Person : Julia
Phone Number : 86-18037871307
WhatsApp : +8618037871307
Minimum Order Quantity : | Negotiation | Price : | Negotiation |
---|---|---|---|
Packaging Details : | Standard National Packing Method | Delivery Time : | Depends on the quality of client |
Payment Terms : | 30% advanced payment , 70% balance payment before shipment or negociatable, T/T | Supply Ability : | 2000 Ton per Month |
Place of Origin: | china | Brand Name: | China |
---|---|---|---|
Certification: | ISO9001,ASTM,RETIE,Nch203,Costa Rica ASTM,EPC,TCL,Q690 Extra High Strength Steel | Model Number: | DINGLI |
Detail Information |
|||
Material: | ASTM A36,ASTM A572 GR65, GR50, Etc. | Type: | Straight Pole ,Tensile Pole ,Turn Pole |
---|---|---|---|
Surface Coating: | Hot Dip Galvanization Or Painting | Wind Pressure: | 5-190 KM/H |
Galvanization: | Hot Dip Galvanization | Life Time: | More Than 30 Years |
Height: | 5-80m | Application: | Mobile Communication Tower |
High Light: | 3 Legs Lattice Telecom Tower,Tubular Lattice Telecom Tower,ASTM A36 Lattice Telecom Tower |
Product Description
Product Name:Communication bts fm radio tv satellite tubular steel 3 leges lattice tower
Product Application
Communication tower consists of tower body, platform, lightning rod, ladder, antenna support and
other steel components, and by hot galvanized anti-corrosion treatment, mainly for microwave,
ultrashort wave, wireless network signal transmission and transmission.
Specifications of galvanized telescopic antenna mast:
communication bts fm radio tv satellite tubular steel 3 leges lattice tower | |
Brand | DINGLI |
Material | Q355/Q345/Q235/Q420 steel |
Surface treatment | Hot dip galvanized/painting |
Height | 1-80m, also can customized as buyer’s requirements |
Wind speed | 30-50m/s, also can customized as buyer’s requirements |
Payload | 500kg, also can customized as buyer’s requirements |
Connection type | Flange |
Service life | More than 30 years |
Application | Park, uptown, playground, street, etc |
Standard | GB |
Certification | ISO9001 |
Delivery time | Within 20 days or depend on the quantity of pole |
OEM | OK |
Welding | Standard | Standard Title |
Pole shafts&multi-sided tubular Cross arms&all accessories |
AWS D1.1/D1.1M:2010 | Structural Welding Code-Steel |
Welding wire | AWS D1.1/D1.1M:2010 | Structural Welding Code-Steel |
Hot dip galvanizing | Standard | Steel thickness/mm | Mean coating thickness/μm | Metallic element | Content |
Pole shafts,cross arms&bolted on accessories | ASTM A123/A123M-15 AS/NZS 4680 | >6 | 85 |
Mn
|
0.25%-0.40%
|
<3-6 | 70 | ||||
1.5-3 | 55 |
Cu
|
<0.15%
|
||
<1.5 | 55 | ||||
Bolts,nuts&washers |
GB/T 5267.3-2008 (ISO 10684-2004) |
_____ | ≥ 54 | P |
<0.025%
|
Foundation bolts | ASTM A153/A153M-09 | _____ | ≥ 54 |
S
|
<0.03% |
Place of Origin: | Henan China (Mainland) |
Brand name: | DINGLI |
Color: | User-defined |
Certificate: | ISO9001:2008 |
Surface Treatment: | Hot Dip Galvanized |
Service life: | 30 years |
Material: | Steel |
Spare Parts: | Parts for connection or installation |
Height: | 6-50m |
Packaging details: | Standard seaworthy package(wooden boxes,cotton ,steel strip and other package)or as buyers' requirement |
Hot dip galvanizing | Standard | Steel thickness/mm |
Mean coating thickness/μm |
Metallic element | Content |
Pole shafts,cross arms&bolted on accessories |
ASTM A123/ A123M-15 AS/ NZS 4680 |
>6 | 85 | Mn | 0.25%-0.40% |
<3-6 | 70 | ||||
1.5-3 | 55 | Cu | <0.15% | ||
<1.5 | 55 | ||||
Bolts,nuts&washers | GB/T 5267.3-2008 | _____ | ≥ 54 | P | <0.025% |
(ISO 10684-2004) | |||||
Foundation bolts |
ASTM A153/ A153M-09 |
_____ | ≥ 54 | S | <0.03% |
1, Wide application
2, Standardized design
3, Matured technology
4, Good quality
Competitive Advantage:
Why Us
1. Experienced staffs replying your inquiry in 24 working hours in fluent English.
2. Customized design is available. OEM&UBM are welcomed.
3. Perfect after sales service. Exclusive and unique solution can be provided to our customer
by our well-trained and professional engineers and staff.
4. Professional factory direct :Best price and timely delivery can be assured.
5. Very convenient transportation.
6. As an honest seller, we always use superior raw material, advanced machines, skilled technicians
to ensure our products to be finished in high quality and stable feature. Welcome to contact us or visit
our company anytime.
Experienced senior engineers and technical staff keeping on learning can help perform design
accurately and timely and ensure quality, reliability and innovation of products. With the help of the
latest advanced design software of PLS-Pole and AutoCAD, experienced engineers of the Company
can design schemes meeting complex landform and environment, so as to meet various needs of
customers.
In the whole pole and tower manufacturing industry, experienced engineers and designers make the
Company be available of designing accurately and timely and ensuring quality, safety and easy
construction. On the basis of an excellent design team, the Company further configures software of
PLS-Tower, AutoCAD, BOCAD and other CAD and updates the software in real time to ensure the
software is the latest.
Supported by both domestic engineering company and Quito tower design center, could provide technical
consultant and design service within our scope of work. For Quito tower design center, most of the
engineers are local staffs. The Design is based on ASTM protocols meantime with GB material standard,
which will reduce the weight, and avoid the replacement on the profiles to save the working time.
Project management—Your Dingli Utility project manager oversees all the details necessary to ensure
your project delivers as specified. What’s more, he/she communicates with you every step of the way.
International Certificate
ASTM,RETIE,Nch203,Costa Rica ASTM,EPC,TCL,ect.
After-Sale Service
Technical Support
Technical support on pre-sales stage. DINGLI has own survey and engineering company with
more than 100 engineers. We have special pre-sales engineer to work with customer at early
stage of the project.
Site assistance
Site assistance in Latin American market, so far we have sales and service center in Spain, Chile,
Bolivia, Peru, Ecuador, Senegal, which will make a fast response for customer.
Warehouse and Emergency Supply
Warehouse and emergency supply for spare parts, damage parts and missing parts: DINGLI has
built production line in Quito and warehouse for transmission line and distribution network in Ecuador,
Bolivia and Senegal with common use spare parts.
Design and Consultant
Supported by both domestic engineering company and Quito tower design center, could provide
technical consultant and design service within our scope of work. For Quito tower design center,
most of the engineers are local staffs. The Design is based on ASTM protocols meantime with GB
material standard, which will reduce the weight, and avoid the replacement on the profiles to save
the working time.
Package
A. Profiles packing methods:
Profiles will be packed by drums. Each drum shall not exceed 2 tons. The profiles below length of 5.8
meters at least tied 4 times, above length of 5.8 meters at least tied 6 times, to ensure them are not
scattered bundle.
Each drum could be adjusted by customers when packing. And there is a plastic filler piece between
every two profiles to avoid being worn.
B. Steel Plate packing methods:
The steel plate ( including warning signs and number plate) will be packed by iron boxes, each box
shouldn’t exceed 2 tons.
There are beams under the box for forklift loading. And each box has lifting holes around the foursquare
easy for lift loading.
C. Bolts packing methods:
Each type of bolts ( including nuts, washers, etc.) will be individually wrapped in woven bags . Each
woven bag should not exceed 30KG, then packed in metal bucket. Each bucket should not exceed
1.5 tons.
D. Identification
Correspondingly, each product has detailed identification from piece to packing box.
E. New packing solution
We also offer a better protect packing solution, named railway frame loading solution.
Techniques:
The products will be fixed as one unit in the container then mounted on the frame, and there are
wheels under the frames. Installing rails in the container, put the frame with products into the container,
then fix it.
In this case, we would additionally charge 1500USD/40GP for the cost price of welding frame and rails
in the factory.
Remarks: Dingli has applied patent for this packing method in 20th OCT, 2016.
International Fully Automatic Pollution-free Galvanizing Line
All the production line of galvanization is sealed off, it is operated by 7 workers with a yearly capacity
of 160,000 tons.
In the new production line, we invest whole package of lifting equipment, all the loading works will be
completed in our factory, in this case, it will be avoided two times loading during transportation, we are
doing our best to protecting our products as always.
The new production line has improved on the part number tracking system, with this system we are doing
better to avoid the missing parts problem
Customer Visit
Clients of Bolivia visited Dingli for factory inspection, we talked about the key issues faced right now,
and found ways to solve it together. They set a high value on this cooperation.
Product Testing:
On December 16, 2018, the steel poles FAT test for project 20kv transmission line in DR-Congo
were carried out in our company's
steel pole test workshop. Participating in the test were representatives of the Spanish EPC and
representatives team from the
Democratic State Grid of DR- Congo. A total of six representatives came to witness the results of
the FAT test. There had 6
types of steel pole were carried out the FAT test. Items of FAT test includes: Material Test, Proofing
Test and Loading Test.
Customers are very satisfied with the test results of our products. The higher test results show that
the product quality of
our steel poles is very reliable.
Enter Your Message