15m-120m Angle Steel Telecom Tower Communication Network Construction
Contact Person : Julia
Phone Number : 86-18037871307
WhatsApp : +8618037871307
Minimum Order Quantity : | Negotiation | Price : | Negotiation |
---|---|---|---|
Packaging Details : | Standard National Packing Method | Delivery Time : | Depends on the quality of client |
Payment Terms : | 30% advanced payment , 70% balance payment before shipment or negociatable, T/T | Supply Ability : | 2000 Ton per Month |
Place of Origin: | china | Brand Name: | China |
---|---|---|---|
Certification: | ISO9001,ASTM,RETIE,Nch203,Costa Rica ASTM,EPC,TCL,Q690 Extra High Strength Steel | Model Number: | DINGLI |
Detail Information |
|||
Material: | ASTM A36,ASTM A572 GR65, GR50, Etc. | Type: | Straight Pole ,Tensile Pole ,Turn Pole |
---|---|---|---|
Surface Coating: | Hot Dip Galvanization Or Painting | Wind Pressure: | 5-190 KM/H |
Galvanization: | Hot Dip Galvanization | Life Time: | More Than 30 Years |
Height: | 5-80m | Application: | Mobile Communication Tower |
Warranty: | Long Term Warranty Also Available | Operation Temperature: | -25°C~+55°C |
High Light: | 70m Telecom Tower,30m Telecom Tower,70m 5g network towers |
Product Description
Product Name: 5G Communication Network 30-70m Construction Angle Steel Telecom Tower
Product Application
Communication tower consists of tower body, platform, lightning rod, ladder, antenna support and other steel components, and by hot galvanized anti-corrosion treatment, mainly for microwave, ultrashort wave, wireless network signal transmission and transmission.
Specifications of galvanized telescopic antenna mast:
Single pipe tower antenna monopole communication tower | |
Brand | DINGLI |
Material | Q355/Q345/Q235/Q420 steel |
Surface treatment | Hot dip galvanized/painting |
Height | 1-80m, also can customized as buyer’s requirements |
Wind speed | 30-50m/s, also can customized as buyer’s requirements |
Payload | 500kg, also can customized as buyer’s requirements |
Connection type | Flange |
Service life | More than 30 years |
Application | Park, uptown, playground, street, etc |
Standard | GB |
Certification | ISO9001 |
Delivery time | Within 20 days or depend on the quantity of pole |
OEM | OK |
Welding | Standard | Standard Title |
Pole shafts&multi-sided tubular Cross arms&all accessories |
AWS D1.1/D1.1M:2010 | Structural Welding Code-Steel |
Welding wire | AWS D1.1/D1.1M:2010 | Structural Welding Code-Steel |
Hot dip galvanizing | Standard | Steel thickness/mm | Mean coating thickness/μm | Metallic element | Content |
Pole shafts,cross arms&bolted on accessories | ASTM A123/A123M-15 AS/NZS 4680 | >6 | 85 |
Mn
|
0.25%-0.40%
|
<3-6 | 70 | ||||
1.5-3 | 55 |
Cu
|
<0.15%
|
||
<1.5 | 55 | ||||
Bolts,nuts&washers |
GB/T 5267.3-2008 (ISO 10684-2004) |
_____ | ≥ 54 | P |
<0.025%
|
Foundation bolts | ASTM A153/A153M-09 | _____ | ≥ 54 |
S
|
<0.03% |
Place of Origin: | Henan China (Mainland) |
Brand name: | DINGLI |
Color: | User-defined |
Certificate: | ISO9001:2008 |
Surface Treatment: | Hot Dip Galvanized |
Service life: | 30 years |
Material: | Steel |
Spare Parts: | Parts for connection or installation |
Height: | 6-50m |
Packaging details: | Standard seaworthy package(wooden boxes,cotton ,steel strip and other package)or as buyers' requirement |
Specifications:
The technical parameters meet the following standard:
Design wind speed: 30M/S (varies by regions)
Icing depth: 5mm-7mm: (varies by regions)
Aseismatic intensity: 8°
Preference temperature: -35℃~45℃
Vertical missing: <1/1000
Ground resistance: ≤4Ω
Preservative treatment: the steel member of the tower is treated with hot dip galvanized anti-corrosion technology, which ensures the tower doesn’t get rusted within 35 years.
Main functions of the communication tower: to support signal transmitting antenna.
Material origin: Baosteel/Shougang Group/Handan Steel/Tangshan Iron & Steel, etc.
Hot dip galvanizing | Standard | Steel thickness/mm |
Mean coating thickness/μm |
Metallic element | Content |
Pole shafts,cross arms&bolted on accessories |
ASTM A123/ A123M-15 AS/ NZS 4680 |
>6 | 85 | Mn | 0.25%-0.40% |
<3-6 | 70 | ||||
1.5-3 | 55 | Cu | <0.15% | ||
<1.5 | 55 | ||||
Bolts,nuts&washers | GB/T 5267.3-2008 | _____ | ≥ 54 | P | <0.025% |
(ISO 10684-2004) | |||||
Foundation bolts |
ASTM A153/ A153M-09 |
_____ | ≥ 54 | S | <0.03% |
1, Wide application
2, Standardized design
3, Matured technology
4, Good quality
Competitive Advantage:
Why Us
1. Experienced staffs replying your inquiry in 24 working hours in fluent English.
2. Customized design is available. OEM&UBM are welcomed.
3. Perfect after sales service. Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staff.
4. Professional factory direct :Best price and timely delivery can be assured.
5. Very convenient transportation.
6. As an honest seller, we always use superior raw material, advanced machines, skilled technicians to ensure our products to be finished in high quality and stable feature. Welcome to contact us or visit our company anytime.
Experienced senior engineers and technical staff keeping on learning can help perform design accurately and timely and ensure quality, reliability and innovation of products. With the help of the latest advanced design software of PLS-Pole and AutoCAD, experienced engineers of the Company can design schemes meeting complex landform and environment, so as to meet various needs of customers.
In the whole pole and tower manufacturing industry, experienced engineers and designers make the Company be available of designing accurately and timely and ensuring quality, safety and easy construction. On the basis of an excellent design team, the Company further configures software of PLS-Tower, AutoCAD, BOCAD and other CAD and updates the software in real time to ensure the software is the latest.
Supported by both domestic engineering company and Quito tower design center, could provide technical consultant and design service within our scope of work. For Quito tower design center, most of the engineers are local staffs. The Design is based on ASTM protocols meantime with GB material standard, which will reduce the weight, and avoid the replacement on the profiles to save the working time.
Project management—Your Dingli Utility project manager oversees all the details necessary to ensure your project delivers as specified. What’s more, he/she communicates with you every step of the way.
To learn more about DINGLI
1. About us
HENAN DINGLI was founded in 1963 as a small electric power equipment manufacturer, after more than 50 years’development, DINGLI now is group company dedicated on total solutions for electricity projects covering survey, design, manufacture, complete equipment supply, construction, operations, maintenance, investment and so on. HENAN DINGLI actively devote to power grid construction, participated in all UHV construction projects and made an outstanding contribution to UHV transmission lines of China.
Since 2000, HENAN DINGLI has been actively developing international business, successively built Ecuador, Cambodia manufacturing Base, Quito tower design center, Spain, Peru, Chile and other overseas service centers. We have got a number of international certificates, such as ISO certificate covering design, equipment and construction, AWS welding certificate, ASTM system certificate, Chile NCH 203 certificate, Colombia RETIE certificate, Costa Rica material quality Certificate, etc. By the end of 2018, the overall proportion of international business is more than 30% of the company's main revenue. We have provided high-quality products and services to more than 100 customers in 33 countries, including the markets of Europe, America, Africa and Southeast Asia. With strong technical support and on-site service capability, HENAN DINGLI has saved a lot of project costs for customers and won their recognition.
To improve the products’ quality and provide superior service for our customers, DINGLI has started using new Production Line for towers at the beginning of 2018. The production line is the most advanced one in the ASIA, which with all the equipment from Italy (Brand: FICEP) and satisfying the most strict laws and regulations of environmental protection in China. The production line equipped with high level of automatic operation, especially the hot dip galvanization, which can meet ASTM standard, EN standard, GB standard under the computer control system.
2. International Certificate
ASTM,RETIE,Nch203,Costa Rica ASTM,EPC,TCL,ect.
3. After-Sale Service
Technical Support
Technical support on pre-sales stage. DINGLI has own survey and engineering company with more than 100 engineers. We have special pre-sales engineer to work with customer at early stage of the project.
Site assistance
Site assistance in Latin American market, so far we have sales and service center in Spain, Chile, Bolivia, Peru, Ecuador, Senegal, which will make a fast response for customer.
Warehouse and Emergency Supply
Warehouse and emergency supply for spare parts, damage parts and missing parts: DINGLI has built production line in Quito and warehouse for transmission line and distribution network in Ecuador, Bolivia and Senegal with common use spare parts.
Design and Consultant
Supported by both domestic engineering company and Quito tower design center, could provide technical consultant and design service within our scope of work. For Quito tower design center, most of the engineers are local staffs. The Design is based on ASTM protocols meantime with GB material standard, which will reduce the weight, and avoid the replacement on the profiles to save the working time.
4. Package
A. Profiles packing methods:
Profiles will be packed by drums. Each drum shall not exceed 2 tons. The profiles below length of 5.8 meters at least tied 4 times, above length of 5.8 meters at least tied 6 times, to ensure them are not scattered bundle.
Each drum could be adjusted by customers when packing. And there is a plastic filler piece between every two profiles to avoid being worn.
B. Steel Plate packing methods:
The steel plate ( including warning signs and number plate) will be packed by iron boxes, each box shouldn’t exceed 2 tons.
There are beams under the box for forklift loading. And each box has lifting holes around the foursquare easy for lift loading.
C. Bolts packing methods:
Each type of bolts ( including nuts, washers, etc.) will be individually wrapped in woven bags . Each woven bag should not exceed 30KG, then packed in metal bucket. Each bucket should not exceed 1.5 tons.
D. Identification
Correspondingly, each product has detailed identification from piece to packing box.
E. New packing solution
We also offer a better protect packing solution, named railway frame loading solution.
Techniques:
The products will be fixed as one unit in the container then mounted on the frame, and there are wheels under the frames. Installing rails in the container, put the frame with products into the container, then fix it.
In this case, we would additionally charge 1500USD/40GP for the cost price of welding frame and rails in the factory.
Remarks: Dingli has applied patent for this packing method in 20th OCT, 2016.
5. Global-network map
China
Henan DINGLI Pole and Tower Co., ltd.
Henan Zhongdingxin Detection Technology Co.,ltd.
Henan Dadi Electricity Engineering Co.,ltd.
Henan DINGLI Power Equipment Co.,ltd
Henan DINGLI Power Construction Co., ltd
Huading Concrete Pole Co., Ltd
Xingjiang Huili Steel Tower Co., Ltd.
Bazhou Dingli Tower Co., Ltd.
Shanghai Sales and Service Center
Beijing Sales and Service Center
Cambodia
Cambodia Phnom Penh Factory
Spain
Madrid (Spain) Sales and Service Center
Dakar, Senegal
Senegal (Dakar) Sales and Service Center
Senegal (Dakar) Spare Part Warehouse
Quito, Ecuador
Quito (Ecuador) Steel Tower Design Center (ASTM Standard)
Quito (Ecuador) Steel Tower Emergency Production Line
Quito (Ecuador) Raw Material and Spare Part Warehouse
Lima, Peru
Lima (Peru) Sales and Service Center
Cochabamba, Bolivia
Cochabamba (Bolivia) Raw Material and Spare Part Warehouse
Santiago, Chile
Santiago (Chile) Sales and Service Center
Jakarta, Indonesia
Jakarta (Indonesia) Sales and Service Center
6. International Fully Automatic Pollution-free Galvanizing Line
All the production line of galvanization is sealed off, it is operated by 7 workers with a yearly capacity of 160,000 tons.
In the new production line, we invest whole package of lifting equipment, all the loading works will be completed in our factory, in this case, it will be avoided two times loading during transportation, we are doing our best to protecting our products as always.
The new production line has improved on the part number tracking system, with this system we are doing better to avoid the missing parts problem.
7. Customer Visit
Clients of Bolivia visited Dingli for factory inspection, we talked about the key issues faced right now, and found ways to solve it together. They set a high value on this cooperation.
Product Testing:
On December 16, 2018, the steel poles FAT test for project 20kv transmission line in DR-Congo were carried out in our company's
steel pole test workshop. Participating in the test were representatives of the Spanish EPC and representatives team from the
Democratic State Grid of DR- Congo. A total of six representatives came to witness the results of the FAT test. There had 6
types of steel pole were carried out the FAT test. Items of FAT test includes: Material Test, Proofing Test and Loading Test.
Customers are very satisfied with the test results of our products. The higher test results show that the product quality of
our steel poles is very reliable.
8. Customers and Partners of Dingli
Enter Your Message